Home >  Term: valid-to date
valid-to date

The end of the period of validity or effectivity of an object, such as a BOM or routing, in the production planning system.

0 0
  • Szófaj: noun
  • Ipar/Tárgykör: Software
  • Kategória: ERP
  • Company: SAP

Szerzőb

  • Kristen
  •  (Silver) 643 points
  • 100% positive feedback
© 2026 CSOFT International, Ltd.