Home > Term: net change master scheduling
net change master scheduling
A master scheduling principle in which net requirements are calculated only for items that have had a change in demand since the last master schedule was calculated.
- Szófaj: noun
- Ipar/Tárgykör: Software
- Kategória: Operating systems
- Company: Microsoft
0
Szerzőb
- Maxiao
- 100% positive feedback